by Per-Ove Melinder | Jun 15, 2023 | Uncategorized
HEAD Engineering AB has signed a contract with Vallviks Bruk AB, a company in Rottneros Group, to design and erect a new separator based Tall Oil Plant, PINOLA TOPP 3000. The plant will be installed during 2024 and will be able to produce 3 ton/h Crude Tall Oil (CTO)....